Common problems in the production of hot zinc boiler
2023-11-28 07:14:29

In the production of hot-zinc boilers, the shutdown and maintenance of zinc pots are inevitable. Especially in large and medium-sized zinc-plating plants, the shutdown of zinc pots takes a long period of one month, and requires a great amount of manpower and material resources. Not only the output of zinc-plating will be restricted, but also the production cost will be greatly wasted. The production efficiency of galvanized factories is reduced. In the production process of zinc pot, if the leakage of zinc occurs, many zinc liquid can not be extracted in time, which will cause great waste, economic losses and environmental pollution. In the process of overhauling the zinc pot, many zinc liquids are converted from liquid to solid, and then from solid to liquid. The cost of zinc liquids being oxidized is more serious, and it takes a long time for the zinc pot to start up again (zinc ingot reheating). According to the investigation of relevant organizations in the industry for many years, it is found that the consumption of zinc in the process of stopping the furnace to dig out zinc is more than 2%.


Related tags:

Contact Information

Head Office

lx44.png Factory Manager:Mr. Shen Taisheng

lx33.png Email:agxinguo@163.com

lx22.png TEL:+8613942222400

lx44.png Export Manager: Mr. Michael Yan

lx33.png Email: bestgalvanizing@163.com

lx22.png TEL & Whatsapp: +8615382137795

lx11.png Office Address: No.111 Minsheng West Road, Tiexi District, Anshan City, Liaoning Provice, China

     Post Code: 114000

lx22.png Landline: +86-(0)412-88124449


Useful links

Site Map

Search

Steel Iron and steel production